The instruments and avionics begin to arrive.
(photo date February 24, 2003) |
A small center console for the fuel gauges, valves and pump switches is fabricated.
(photo date March 30, 2003) |
The instruments are installed in the new panel. Holes are cut for extra instruments and radios that will be added later. A fuse block is behind the glove box door.
(photo date August 17, 2003) |