The Rotax 912 S engine arrives packed in a carton.
(photo date January 14, 2003) |
The fuel pumps are installed between the ribs in the center wing section and are plumbed to the fuel selector valve.
(photo date June 8, 2003) |
The engine is bolted to the engine mount and the radiator is installed.
(photo date February 16, 2004) |
The throttle and choke cables are connected to the levers on the carburetors.
(photo date February 16, 2004) |
The clamps for the oil cooler mounting bracket are fabricated in a vise-mounted brake.
(photo date March 14, 2004) |
The nice, three-bladed wooden propeller is assembled and stored on the wall until final installation.
(photo date March 28, 2004) |